Finalized design projects


We present below few of the design projects for electrical networks that are finalized:

- Coexistence study and construction of electrical line of 0,4Kv and FO/CAT network in Constanta City; beneficiary RCS RDS SA Bucuresti.

- Power supply set up for the organic deposit of waste of RM Valcea City in the Feteni area and connection to the electrical network of the composting station of Raureni; beneficiary Monticava Strade SRL RM. Valcea

- Power supply set up and connection to the electrical network of a water station and pumping station in Ladesti and water station in Valea Mare; beneficiary Intergroup Engineering SRL Bucuresti

- Deviation of an electrical open air transmission line LEA 20 kV Pitesti Nord-PA Prundu from the location of the Commercial Complex Bradu Pitesti, judetul Arges; beneficiary SC CEZ DISTRIBUTIE SA

- Deviation of an electrical open air transmission line LEA 20 kV Ghercesti-Avicola Simic and LEA 20kV PA1-PA2, in order to release the location for the beneficiary SC CEZ DISTRIBUTIE SA

- Design of electrical distribution boards, electrical panels and one-phase and three-phase measurement and protection blocks

- Deviation of an electrical open air transmission line LEA 110 kV double circuit Bradu-Prundu-Mioveni from the location of the Commercial Complex Pitesti at km 6+780 on DN 65 B; beneficiary SC CEZ DISTRIBUTIE SA

- Relocation of electrical poles and lines of 110 kV from the ring road of Craiova; beneficiary SC FDEE Electrica Oltenia SA

- Deviation of an electrical open air transmission line LEA 220 kV Isalnita-Kozlodui at the intersection with the new ring road of Craiova; beneficiary CN TRANSELECTRICA S.A.

- Consolidation of LEA 400kV Urechesti-Domnesti in the area of pole number 246; beneficiary CN TRANSELECTRICA S.A.

- Consolidation of LEA 400 kV Tantareni-Bradu in the area of pole number 262; beneficiary CN TRANSELECTRICA S.A.